The existing lining system to this concrete bund had failed and was lifting. As the bund sits over a water table it was essential for the client to have an effective lining system in place.
Oasis stripped back the existing system and prepared the concrete using a mixture of methods including scabbling and localised diamond grinding.
After preparation we installed a three-coat resin coating system with fibreglass reinforcement to various areas, with the final coat providing a UV resistant, highly chemical resistant resin finish.

